Evgeny Maradin
Pre-FEED / FEL | Upstream Oil & Gas
Engineering decisions
before FEED.
Lead Project Engineer for FEL1–FEL2, Pre-FEED, FEED and brownfield development, with hands-on operations and maintenance background.
Based in the Philippines · open to permanent, contract and rotational roles · available to mobilise within 2 weeks · Middle East, Africa, Southeast Asia
Project value is often determined long before detailed engineering starts. The critical work is making assumptions visible, integrating disciplines, testing options and creating a decision that can survive the transition into execution.
Selected cases
Project cases.
Portfolio Integration – 6 Fields
Restructured development across six mature assets and identified shared infrastructure that changed the portfolio investment case.
≈ $48M
Water Injection Re-engineering
Merged a development scope and an asset-integrity programme into one study and replaced a disproportionate redevelopment concept: VRR from 70% to 95% at 80% lower CAPEX.
$3.6M saved
EPC Bid Analysis & Contract Strategy
Decomposed bid escalation drivers across a major upstream portfolio and structured scenarios around schedule, FEED maturity, scope and risk allocation.
independent advisory input
Engineering scope
What I work on.
Concept Development
FEL1–FEL2, Pre-FEED, option screening, concept selection and investment readiness.
Brownfield Optimisation
Re-engineering, debottlenecking, live-asset interfaces and execution constraints.
Integrated Development
Production, subsurface, facilities and operations aligned around one development logic.
Economics & Risk
CAPEX optimisation, technical uncertainty, execution risk and decision scenarios.
Study Leadership
Multidisciplinary teams, contractor interfaces, governance and gate-ready deliverables.
Digital Decision Support
Digital Oilfield experience and interactive models that make constraints visible.
Latest insights
Reading the region as an early-phase engineer.

A concept check of the 2014 Kurdamir development plan on public data. The CPF, not the reservoir, limits the plan; a larger phased concept adds 3.8 billion $ of modelled NPV.
Read article →
Gulf exports are back above 80% of pre-war levels, but via bypass routes. An export route is a system of pipeline, storage, terminals and vessels, and each can bind.
Read article →
Kirkuk is going from 320,000 to 420,000 bpd. The first barrels come quickly from existing wells, but the outlets for their gas take years. The real question is sequencing.
Read article →